Hong Kong - Zhuhai - Macau Bridge, China

 

This prestigious project has a life time requirement of 120 years without maintenance, and therefore duplex stainless steel reinforcement – grade EN1.4362 has been specified in the critical areas of the structure, mainly in splash zones. The first phase requires 4,000 ton of stainless steel reinforcement. The total requirement is estimated to be 15,000 ton.

Details in English
Details in Chinese

For more information, click here (Acerinox), here (Road Traffic Technology) and here (Cedinox Magazine).